关键字

添加
  • Lat51_Training

    4小时前

    Costs up on everything and a decrease in value/effort.

    This is happening in the copper mining and related civil industry. Sure there are shilly consultants and whatnot (big M) but even design companies are giving low level engineering design and behind on everything.

    I cannot help but think that decades of inflation and poor incentives are coming to roost. They’re expected to work well beyond standard hrs and provide gold standard for cheaper. Rates are coming higher to recoup losses.

    Client requests also drive this but the ballooning of staff to do work for the same mine tonnage with lower recovery makes production even more critical.

    Perhaps engineering and mineral extraction can be revived on a bitcoin standard. Value for value.

  • 没有更多记录

    没有更多记录
    没有更多记录
发送

联系人

加载更多

登录 注册>>

资料修改成功

取消 确定
29%
正在上传
网络连接中